Begin installation on side away from wind rain direction.
Westman steel roofing installation guide.
Simply choose the installation guides appropriate for your project.
Install base flashing step 7.
Roof sheets step 4.
Install ridge cap step 5.
3 roofing panel install with lower edge overhanging eave edge by at least 1.
Install roof trim flashing and westman steel underlayment step 3.
Add the metal panels.
Fasten eave starter with 10 x 1 long galvanized zip screws 12 o c.
Always begin working at the point with the longest peak to eave distance.
Gable trim after applied step 6.
Drive through the outside closure and the ribs of the panel beneath.
5 outside closure install along upper edge of panels about 2 below the edge.
Other wall trims and flashings step 8.
For curved cutting use a jigsaw or metal cutting shears.
Installation guide important notes.
Take care the first piece is aligned precisely perpendicular square to the edge.
Installation consists of the following steps.
From basic sheet steel cladding to snaplok roofing panels and on to more sophisticated steel shingles with stone coating and even steel spanish tiles.
Wall sheeting step 9.
Trim the bottom of the valley to the correct angle and allow 5 8 to bend around the eave starter.
Install eave starter at all eaves.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
All products offer advanced benefits such as long service lives easy installation and little maintenance over traditional roofing materials.
Accurately measure the roof and create a roof plan for estimating and ordering roof panels and accessories ensure all required roof penetrations are in place before beginning pluming vents exhaust attic venting etc remove any dirt or debris from.
4 panel wood screw space according to recommended fastening pattern and local codes.
Installation guide handling.
When installing roofing panels take care to avoid walking on the butt of the panels.
Underlayment is to be installed over the eave starter.
Stack short sheets on top of longer ones.
Material checklist step 2.
During cutting secure sheets to ensure clean cuts.
Clean sheets of any debris before installation.
Screw length is to be long enough to penetrate the decking.
Fasten valley in place with clips and fasteners on the outer edge of the valley every 16 on center.
Use a circular saw with a fine tooth blade at a high speed but a low advance rate to cut 3 4 sheets at a time.
Store sheets in a cool and dry place out of direct sunlight.